Projects


La Casa de Christo Lutheran Church
Scottsdale, AZ
P.M.: Dave Terrell
G.C.: Redden Construction
Erector: Prosteel Erectors

Due to a 150’ clear span in the center of the building, we chose to assemble the truss frames on the ground and hoist them into place.




Desert Ridge Marketplace
Scottsdale, AZ
P.M.: Tom Hobson
G.C.: McCarthy Construction
Erector: Top Flite Construction

Mutiple shops with various architectural features around the exteriors.


Pinnacle at Kierland
Scottsdale, AZ
Four-story office structure
P.M.: Dave Terrell
G.C.: Wespac Construction
Erector: Top Flite Construction

The schedule allowed for six weeks of erection.

Due to tight schedule, we opted to preassemble the brace frames on the ground and set them as units. The joists were hoisted into place using an engineered picking rack.

The building was divided into nine sequences, each with it’s own color code for identification.

The last beam was set four weeks from start of erection.



Arizona State University
Interdisciplinary Science + Technology Building II
Tempe, AZ
Brace frame structure with precast concrete floors.
P.M.: Dave Terrell
G.C.: Wespac Construction
Erector: Top Flite Construction

This is an extremely complex structure with unique structural and architectural components.


Careful planning was used due to extreme site restrictions.